Universidad Complutense de Madrid
E-Prints Complutense

A goal programming approach for farm planning with resources dimensionality

Impacto

Descargas

Último año

Ortuño, M. Teresa y Vitoriano, Begoña (2011) A goal programming approach for farm planning with resources dimensionality. Annals of Operations Research , 190 (1). 181 -199 . ISSN 0254-5330

[img] PDF
Restringido a Sólo personal autorizado del repositorio hasta 31 Diciembre 2020.

983kB

URL Oficial: http://link.springer.com/article/10.1007/s10479-009-0524-5


URLTipo de URL
http://link.springer.com/Editorial


Resumen

Crop production entails many decision making processes aimed at improving productivity and achieving the best yield from scarce resources, which are normally limited. Assuming that there is a certain technical path of tasks to be carried out within a period, and that each task can be done in different ways, the problem addressed in this paper consists of choosing how and when to carry out each one, in such a way that the tasks are scheduled in sequence at the lowest possible cost, taking account of any relations of precedence among them, and in such a way that each task is done within its time window and with the resources being assigned in a feasible way. Time windows are usually defined in a strict way, and thus, if adjusted, can be a cause of infeasibility for some of the problems, implying the need to acquire new resources. Nevertheless, in most cases small deviations from time windows could be acceptable. In this paper a mixed 0-1 programming model to attain the proposed objective is proposed, applying goal programming to model time windows in a more flexible way.


Tipo de documento:Artículo
Palabras clave:Agricultural planning; Mixed 0-1 programming; Interval goal programming; Management; Models
Materias:Ciencias > Informática > Lenguajes de programación
Código ID:17297
Depositado:03 Dic 2012 10:27
Última Modificación:25 May 2016 14:30

Descargas en el último año

Sólo personal del repositorio: página de control del artículo