Universidad Complutense de Madrid
E-Prints Complutense

A goal programming approach for farm planning with resources dimensionality

Impacto

Downloads

Downloads per month over past year

Ortuño, M. Teresa and Vitoriano, Begoña (2011) A goal programming approach for farm planning with resources dimensionality. Annals of Operations Research, 190 (1). 181 -199. ISSN 0254-5330

[img] PDF
Restringido a Repository staff only

983kB

Official URL: http://link.springer.com/article/10.1007/s10479-009-0524-5


URLURL Type
http://link.springer.com/Publisher


Abstract

Crop production entails many decision making processes aimed at improving productivity and achieving the best yield from scarce resources, which are normally limited. Assuming that there is a certain technical path of tasks to be carried out within a period, and that each task can be done in different ways, the problem addressed in this paper consists of choosing how and when to carry out each one, in such a way that the tasks are scheduled in sequence at the lowest possible cost, taking account of any relations of precedence among them, and in such a way that each task is done within its time window and with the resources being assigned in a feasible way. Time windows are usually defined in a strict way, and thus, if adjusted, can be a cause of infeasibility for some of the problems, implying the need to acquire new resources. Nevertheless, in most cases small deviations from time windows could be acceptable. In this paper a mixed 0-1 programming model to attain the proposed objective is proposed, applying goal programming to model time windows in a more flexible way.


Item Type:Article
Uncontrolled Keywords:Agricultural planning; Mixed 0-1 programming; Interval goal programming; Management; Models
Subjects:Sciences > Computer science > Programming languages (Electronic computers)
ID Code:17297
Deposited On:03 Dec 2012 10:27
Last Modified:16 Nov 2018 19:22

Origin of downloads

Repository Staff Only: item control page